J-CLASS YACHT THE "RAINBOW"
SCALE 1:19

the building process     page 6


the turning wheels for the yankee and genoa sail

levers for the rudder

levers build in the hull

winch for the fore and backstay's, the worm keeps it tight.

there wil be placed two winches with a heavy spring in the steel cable.

placeing the front winch for the for stay's

winch for the backstay

throughput for the forstay one

throughput for the forestay two

both throughputs at the foreship

lead keel in 3 blocks

Placed in the hull  20,1 kilo at the moment
 
the first contact with the water.
 

the motor runs perfectly at a perfect speed. 

he turns arround his axe
   

previous page  - next page

For comment, questions or suggestions
please use the contact form


Last changes made, 24-jan-2014